GTS led the traffic engineering tasks for the 20th Street Connection project, closing a critical gap in the bicycle and pedestrian network between the Michigan Avenue Neighborhood Greenway (MANGo) and areas on the other side of I-10, including the Expo Corridor Bike Path and two Metro E Line stations. The project achieved this critical linkage with an innovative combination of Class I shared-use paths alongside I-10, a Class IV protected bikeway along 20th Street, and a signalized bike crossing.
GTS initially conducted traffic and truck turning analyses and evaluated conceptual design alternatives before preparing traffic signal designs, signing and striping plans, traffic control plans, and street lighting improvement plans. The team coordinated closely with the City and Caltrans to address right-of-way constraints and develop design solutions in accordance with applicable Highway Design Manual standards.
The resulting improvements have enhanced bicycle and pedestrian connectivity, supported safer traffic operations, and strengthened access to the surrounding active transportation network. The project received a Commendation and Merit Award from the American Council of Engineering Companies (ACEC), highlighting its innovative approach to multimodal transportation design.


