As part of the team for the City of West Hollywood’s Melrose Streetscape Project, GTS provided design services for fiber-optic communication systems and electric-vehicle charging stations. The major project goals were to bring fiber to the Design District, serving all major commercial corridors, traffic cabinets, light poles, and bus stops; to tie the new fiber to existing fiber lines and the data center at City Hall, creating a resilient fiber loop; and to bring fiber to smart poles that will be used for Wi-Fi access and other Smart City applications.
GTS’s design services included:
-
Fiber Optic and Smart Street Improvement Plans detailing the fiber optic system for the entire length of all streets (including system network maps, splicing details, interconnect system, hub splice vaults, traffic management system connection, and IP address table).
-
Street Lighting Improvement Plans detailing streetlights and pedestrian lights in the sidewalk/parkway zone. The design services included photometric analysis, load calculations, and coordination for power sourcing and metering.
-
Smart In-Roadway Warning Light (IRWL) System Improvement Plans detailing in-roadway warning lights at the designated intersections and crosswalks. This included LED edge-lit signs, push-button activation technology, and either hard-wired or solar power sources.
-
Traffic Signal and Highway Safety Light Improvement Plans including detailed design of traffic signal systems and highway safety light systems at the controlled intersections. GTS services included all signal elements, from pedestrian push buttons and countdown timers to signal equipment, conduits, conductors, cabinets, meters, circuitry, signage, and loop detection/video detection.
-
EV Charging Improvement Plans detailing EV chargers for on-street curbside parking. This included the Level 2 dual charger system design, connections for all EV chargers to meters and cabinets, load calculations, and power sourcing.