GTS provided engineering design services for street lighting improvements along Alpine Street, Vernon Drive, and Palm Avenue in the City of Upland. The project focused on replacing existing street lights with new concrete poles, mast arms, and luminaires to enhance roadway illumination and support reliable street lighting infrastructure.
GTS prepared comprehensive plans, specifications, and estimates (PS&E) for the proposed street lighting improvements. The design included voltage drop and conduit fill calculations, lighting circuit design, conduit routing, circuit breakers, lighting controls, grounding systems, and associated electrical notes and diagrams. These elements were developed to support the installation and operation of the upgraded street lighting system in accordance with applicable standards and City requirements.
Throughout the design process, GTS coordinated with Southern California Edison (SCE) regarding proposed electrical power services and meter pedestals. The resulting design provided a coordinated approach to modernizing the street lighting infrastructure, improving lighting reliability, and supporting safer roadway conditions along the project corridors.
